High Level Dialogue: Strengthening the Resilience of Telecommunication Submarine Cables
This discussion centred on the conclusion of the International Advisory Board (IAB) on Submarine Cable Resilience, a two-year initiative co-led by ITU and the International Cable Protection Committee (ICPC) and its report aimed at strengthening the resilience of global submarine cable infrastructure . Submarine cables carry approximately 99% of international internet traffic , and the panel noted that between 150 and 200 outages occur globally each year, with around 80% caused by human maritime activities , while the average repair time has increased from 20 to over 50 days due to an ageing and insufficient fleet of repair vessels .
Minister Bosun Tijani of Nigeria reflected on the 2024 West African cable cuts as a catalyst for the initiative , emphasising that governments must establish clear coordination protocols rather than leaving resilience entirely to cable owners . Prof Sandra Maximiano highlighted three key lessons from Portugal's experience: geography creates both opportunity and responsibility, resilience must be built by design, and cooperation must precede incidents . Singapore's Timothy Chin described practical policy measures, including streamlined permitting, maritime spatial planning, and a whole-of-government coordination approach that reduced cable repair application response times to three to five working days .
From a financing perspective, the World Bank's Sangbu Kim cited the 2022 Tonga volcanic eruption, where damage to a single cable caused 61 days of near-total digital isolation and affected 39% of the country's GDP, underscoring the need to treat submarine cable infrastructure as a public good . China Telecom's Athena Jun Xian noted that industry is already incorporating resilience into investment decisions through route diversification and multiple landing stations .
Panellists broadly agreed that the most urgent priority is moving from documentation to implementation , requiring investment in repair capacity and human expertise , greater regulatory harmonisation across jurisdictions , and clearer delineation of roles between governments, industry, and international organisations . The discussion concluded with a consensus that the IAB report provides a practical foundation - described by Minister Tijani as 'almost like a manifesto' - for governments and stakeholders worldwide to strengthen submarine cable resilience through coordinated, multistakeholder action .
Overall Purpose
- The discussion centred on the conclusion of the International Advisory Board (IAB) on Submarine Cable Resilience, a two-year multi-stakeholder initiative co-led by ITU and ICPC. The session aimed to present the IAB's final 200-page report, celebrate its achievements, and - critically - shift focus from policy recommendations towards concrete implementation at national and international levels.
- --
Major Discussion Points
- The critical importance of submarine cables and the scale of the resilience challenge: Speakers emphasised that submarine cables carry approximately 99% of international internet traffic, making them foundational to global economies, security, and societies. The fragility of this infrastructure was underscored by figures citing around 180 cable breaks in 2025 alone, with 80% of outages caused by human maritime activities. The case of Tonga was cited as a stark example, where damage to a single cable caused 61 days of near-total digital isolation and affected 39% of the country's GDP. The repair situation is worsening, with average repair times rising from 20 to over 50 days due to an ageing and insufficient fleet of only roughly 70 vessels. - The IAB's work and the transition from awareness to action ("from paper to practice"): The IAB, comprising 42 members and 175 working group experts, produced a comprehensive report covering deployment, repair practices, risk monitoring, and connecting the unconnected. Both co-chairs stressed that the advisory body's work must now be seen as a transition from awareness to action, with Prof Maximiano explicitly framing it as moving 'from paper to practice.' Minister Tijani described the report as a 'masterpiece' and a 'manifesto' that ministers can use to prepare better, noting that no comparable guidance existed when West African cables were cut in March 2024.
- The roles of government, industry, and international organisations in building resilience: A recurring theme was that resilience cannot be achieved by any single stakeholder acting alone. Governments were urged to establish clear coordination protocols, streamline permitting, and create enabling environments for industry. Singapore's model of a single point of contact for cable deployment and a three-to-five working day response for repair applications was cited as best practice. Industry was called upon to continue innovating, build repair capacity, and integrate resilience into commercial models from the outset. International organisations such as ITU were recognised for their convening power, awareness-building, and advocacy roles. - Investment, redundancy, and geographic diversity as structural priorities: Multiple speakers highlighted the need for sustained investment in cable deployment, maintenance, and repair capabilities, as well as greater route diversity and redundancy. From an industry perspective, risk mitigation strategies include avoiding high-risk zones such as the Red Sea and Strait of Malacca, developing alternative terrestrial routes, and designing systems with multiple landing stations. The World Bank emphasised the importance of designing resilience requirements into financing models from the beginning, using de-risking mechanisms and public-private partnerships to attract private sector investment. Portugal's Atlantic CAM (Continent-Azores-Madeira) cable, with its ring topology, was cited as an example of resilience built by design. - Implementation as the defining next step, including legal frameworks and regulatory harmonisation: Speakers converged on the view that the immediate priority is implementation of the IAB's recommendations at both national and international levels. This requires clearer roles and responsibilities among governments, development finance institutions, and private operators. Questions were raised about whether existing legal frameworks - including a 19th-century telegraph cable protection treaty - are sufficient, or whether stronger international legal instruments are needed. Prof Maximiano called for regulatory harmonisation across jurisdictions to reduce fragmentation and complexity, and for investment in capacity building to ensure the right people are in place to manage incidents. ---
Overall Tone
- The overall tone of the discussion was constructive, collaborative, and cautiously optimistic. Speakers consistently expressed pride in the IAB's achievements and gratitude for the multi-stakeholder effort that produced the final report. There was a shared sense of momentum and purpose, with the mood shifting progressively from celebration of what had been accomplished towards a forward-looking urgency around implementation. Minister Tijani's candid admission that he was "totally clueless" about what to do when cables were cut in West Africa added a note of honest vulnerability, grounding the discussion in real-world stakes. By the closing remarks, the tone had become firmly action-oriented, with speakers repeatedly reinforcing that the time for documentation had passed and that concrete steps - investment, coordination, regulatory clarity, and capacity building - must now follow.
Expanded Summary: International Advisory Board on Submarine Cable Resilience - Final Session
#
Opening Remarks and Context
The session marked the formal conclusion of the International Advisory Board (IAB) on Submarine Cable Resilience, a two-year multi-stakeholder initiative co-led by the International Telecommunication Union (ITU) and the International Cable Protection Committee (ICPC). Thomas Lamanauskas, Deputy Secretary General of ITU and Co-Executive Secretary of the IAB, opened proceedings by describing the occasion as a landmark moment, noting that the advisory board had completed its work and delivered to the expectations set two years prior . He explained that the initiative had originated from a conversation between himself and Minister Bosun Tijani following cable breaks off the coast of West Africa, with the central question being how governments and the private sector could come together to ensure that everyone knows what to do and that there is a clear set of recommendations to deliver on that goal .
Lamanauskas outlined the structure of the IAB's work: the body comprised 42 members - 40 plus two co-chairs - and engaged 175 experts across three working groups covering repair and deployment practices, risk monitoring and identification, and connecting the unconnected through submarine cables . The process had moved through a summit in Abuja, where the work framework was established, to a subsequent summit where recommendations were agreed, and finally to the present session, which concluded with the delivery of a 200-page report . Lamanauskas described the report as rich information that he believed would become a handbook for the area, and framed the day's discussion around the transition from documentation to action - borrowing a phrase from co-chair Professor Sandra Maximiano - "from paper to practice" .
John Wrottesley of the ICPC, who moderated the panel, brought a physical piece of CWI-3 submarine cable - a lightweight cable installed around 1999 or 2000 - as a prop to frame the discussion, offering participants a tangible illustration of the infrastructure under consideration and noting that this particular piece had spent approximately 25 years on the deep ocean floor .
---
#
The Critical Importance of Submarine Cable Infrastructure
A foundational theme running through all contributions was the indispensable role of submarine cables in modern life. Lamanauskas reminded participants that submarine cables carry approximately 99% of international internet traffic, and that economies, societies, and financial infrastructure are deeply dependent on them . He noted that cables do break - with around 180 breaks recorded in the last year - and that when multiple cables fail simultaneously, the consequences are acutely felt .
Professor Sandra Maximiano reinforced this framing, stating that submarine cables are fundamental to digital economies and societies and that protecting them is not only a telecommunications issue but an economic, security, and development priority . She called for greater diversity and redundancy of international connectivity, sustained investment in cable deployment, maintenance and repair capabilities, and streamlined regulatory procedures to enable more efficient deployment and repair . She also noted that the resilience ecosystem should be broadened to include satellites, observing that this had been under discussion that very morning .
Mr John Mills of the US Department of State added that the United States relies on undersea cables for economic growth, national security, and its digital future, and that cables are how trillions of dollars in transactions are performed daily and how the internet empowers future innovators . For Singapore, the stakes were described as even more existential: Timothy Chin of IMDA explained that as a small, sea-locked island nation in a region of 700 million people, submarine cable connectivity is critical not just for prosperity and economic growth but frankly for survival .
Minister Bosun Tijani of Nigeria offered a philosophical framing, invoking the concept of anti-fragility to argue that as the world becomes more networked and dependent on intelligent systems, it is not sufficient merely to withstand stress - systems must be designed to learn from it and become stronger . He quoted an African proverb - "what an old man sees while sitting down, a young man cannot see even if he climbs to the top of a tree" - to underscore that more experienced actors bear a particular responsibility to prepare their communities for future challenges . He warned that the more the world connects and trusts intelligent systems, the greater the consequences of a major cable cut, and that humanity has the capability to manage this challenge if it chooses to do so .
---
#
The Scale of the Resilience Challenge
The World Bank's Sangbu Kim provided some of the most striking data of the session, painting a sobering picture of the current state of global cable resilience. He noted that between 150 and 200 outages occur globally every year, with approximately 80% caused by human maritime activities . Yet the global repair capacity is critically inadequate: only around 70 repair vessels exist worldwide, of which only 20 to 25 are dedicated long-term repair vessels, and a significant proportion of the fleet is over 30 years old . As a result, average repair times have more than doubled, rising from around 20 days to over 50 days, meaning the situation is getting progressively worse .
Kim illustrated the catastrophic consequences of cable vulnerability for small economies through the example of Tonga, where a volcanic eruption in 2022 caused damage to a single cable that resulted in near-total digital isolation for 61 days, affecting USD 182 million in GDP - equivalent to 39% of the country's total GDP . This example powerfully demonstrated that submarine cable resilience is not merely a concern for large, well-connected nations but an existential development issue for smaller and more vulnerable economies.
---
#
The IAB's Achievements and the Transition from Awareness to Action
All speakers were united in celebrating the IAB report as a landmark achievement. Lamanauskas described it as a rich document that he believed would become a handbook for the field, noting that it had effectively been co-written by more than 200 people - the 42 IAB members together with 175 working group experts - all of whom had to agree on its contents . Wrottesley confirmed that he had read every word of the report and strongly recommended that all stakeholders engage with it and look towards implementation .
Professor Maximiano described the IAB's work as representing a transition from awareness to action, noting that the body had identified challenges, exchanged experience from around the world, and developed practical recommendations, with the shared responsibility now being to transform those recommendations into operational preparedness . She emphasised that this means establishing clear responsibilities, improving coordination among all stakeholders, testing preparedness, and ensuring that when disruption occurs, countries have the capacity to respond, repair, and recover quickly .
Minister Tijani went furthest in his assessment, describing the report as a masterpiece and almost like a manifesto that ministers can use to prepare better . He noted candidly that when cables broke off West Africa on 14 March 2024, he was totally clueless about what he needed to do to support the response, and that there were not many documents that could help at the time . The IAB report, he argued, changes that fundamentally, providing a strong foundation for ministers to prepare and act . He also expressed his personal belief that the advisory board would become a model for resilience generally, noting that ITU had also produced a related report on when digital systems fail, which showed that many countries are not ready for such scenarios .
---
#
National Policy Approaches: Singapore, Portugal, and Nigeria
The panel drew on the contrasting national experiences of Singapore, Portugal, and Nigeria to illustrate different approaches to submarine cable resilience policy.
Timothy Chin described Singapore's comprehensive and institutionalised approach. IMDA functions as both a regulator and an industry developer - a dual role Chin described as critical to the effectiveness of Singapore's approach . As a small, sea-locked island nation, Singapore published a digital connectivity blueprint in 2023 with an ambition to double its number of cables from 26 to 52 within ten years, though it currently stands at just over 30 . Singapore's regulatory approach is built on fit-for-purpose legislation across multiple acts - the Telecommunications Act, the Maritime and Port Authority Act, and the Merchant Shipping Act - which together provide sufficient provisions to address subsea cable issues, including requirements for cables to be buried to depths of four to twelve metres depending on seabed conditions . Maritime spatial planning and protected zones for cables have also been established to manage Singapore's status as a busy maritime hub . Crucially, IMDA acts as the single point of contact in the Singapore government for cable deployment applications, coordinating with all relevant agencies at the back end so that cable owners and operators need only engage with one body . For cable repairs, the Maritime Port Authority serves as the single point of contact and has committed to responding to repair applications within three to five working days, reduced from the previous standard of one week .
Professor Maximiano outlined three key lessons from Portugal's experience. First, geography creates both opportunity and responsibility: Portugal's Atlantic position makes it a gateway between Europe, Africa, and the Americas, with approximately 25% of submarine cables passing through its exclusive economic zone, positioning it as a significant connectivity hub . However, this also creates substantial responsibility for the infrastructure passing through Portuguese waters . Second, resilience must be built by design: the Atlantic Cam cable connecting mainland Portugal with Madeira and the Azores uses a ring topology that improves resilience while supporting territorial cohesion, and integrates smart cable technologies that can simultaneously strengthen connectivity, scientific cooperation, and early warning capabilities . Third, resilience depends on cooperation before incidents occur: Portugal has organised national exercises involving regulators, operators, the Navy, and other public authorities to test procedures and improve coordination, demonstrating that resilience is as much about governance and preparedness as it is about infrastructure .
Minister Tijani provided a frank account of Nigeria's experience. When cables broke off West Africa in March 2024, he described himself as totally clueless about what to do, with his regulator having only a partial understanding and defaulting to telling cable owners to find their own solutions . He noted that cable owners might even view a competitor's outage as an opportunity for commercial advantage rather than a moment for solidarity, and that the IAB report's recommendations help establish the moral obligation and societal demand for capacity-sharing in such circumstances . He argued that this reflects a broader failure of government to establish clear coordination protocols, and that resilience is not about new laws or fines but about what government can do to help coordination be faster and better . He cited a more recent positive example: when a cable company came to his ministry for clearance, he was able to secure a presidential directive aligning all agencies, resulting in the fastest cable landing in Nigeria's history . He called for every country to have a coordinating body - whether a regulator or another agency - with a set protocol enabling it to summon all relevant agencies to address a broken cable . He also proposed that West Africa could consider establishing a regional monitoring centre focused on predicting cable disruptions, given the shared nature of cables across the region .
---
#
Industry Perspectives: Route Planning, Redundancy, and Commercial Models
Athena Jun Xian of China Telecom Europe offered an industry perspective on how resilience is already being incorporated into investment decisions for new submarine cable systems. She identified two key dimensions of risk mitigation. First, in route planning, developers proactively avoid high-risk zones including fishing grounds, anchorage areas, shipping lanes, seismic belts, and congested geopolitical choke points such as the Strait of Malacca and the Red Sea . New Eurasia cable systems have adopted alternative Middle Eastern routes passing through Saudi Arabia or Oman via terrestrial segments to bypass the Red Sea, substantially improving overall cable safety . Second, in geographic deployment, each submarine cable system is designed with multiple landing stations, each interconnecting with various independent cable systems, with cross-border circuits and customer services evenly distributed across diverse systems to mitigate single-point failures .
Jun Xian argued that by embracing diversified deployment and network redundancy during the investment and construction phase, operators can effectively mitigate disruptions to international services caused by single-point failure . She endorsed the IAB's work as reflecting the shared aspiration of all parties to build a safe, reliable, and inclusive global submarine cable network, and called for all governments and industrial enterprises worldwide to actively adopt and fully implement the IAB's guiding recommendations .
Kim complemented this industry perspective from a development finance angle, arguing that resilience requirements must be designed into financing models from the very beginning, with spur branching units and new landings incorporated at the design stage . He emphasised the importance of well-designed public-private partnerships and de-risking mechanisms - including guarantees and public grants - to enable private sector investment in resilience without undue commercial risk . He also argued that private operators must integrate resilience into their commercial models, and that if they cannot fully embrace safe and resilient measures from the beginning, stakeholders must keep pushing back .
---
#
The Role of Government, Industry, and International Organisations
A central and recurring theme of the discussion was the appropriate division of roles and responsibilities among governments, industry, and international organisations. There was broad consensus that resilience cannot be achieved by any single stakeholder acting alone, and that governments, regulators, industry, international organisations, the technical community, and academia all have a role to play .
Chin articulated a clear framework for this division. Governments should focus on internal coordination before engaging with the private sector, integrating both regulatory and economic needs into coherent policies and frameworks . Industry should continue to innovate, bring new solutions and technologies, develop repair capabilities, and cooperate openly with governments . International organisations such as ITU play a distinct but equally important role in awareness building, advocacy, and convening power - bringing the right people into the right room to have the right conversations .
Mills offered a complementary perspective from the US government, arguing that industry probably knows the operational details of cable maintenance and continuity better than government, since it is their business to maintain continuity of operations . Government's role, he suggested, is to communicate its priorities clearly to industry, ensure legal accountability for cable breaks through transparent due process, and create a secure and trusted environment in which industry can be unleashed to innovate .
Tijani pushed back against any framing that treats cables as purely private property and responsibility, arguing forcefully that cable owners do not own the banks, are not responsible for GDP, and are not responsible for healthcare - the entire economy bears the cost of cable failures, not just the cable owners . He stated that there is no world where government will look away from cable resilience, whether in landing, repair, or redundancy, and that it will cost businesses more if government is totally not in the loop . He called for every nation to have a clear plan on the role of government, and for ITU to support governments in taking the right action and putting the right protocols in place . He drew a parallel with Nigeria's declaration of telecommunications infrastructure as critical national infrastructure, which he said resulted in over one billion dollars of private sector investment within six months .
---
#
Implementation as the Defining Priority
The panel converged strongly on the view that the immediate and defining priority is moving from the IAB report to concrete implementation. Maximiano stated plainly that what is really important now is to move to implementation, requiring willingness and commitment from all stakeholders to move from rhetoric to something that is really in practice . She identified four key requirements: investment in deploying more cables and repair capacity as well as in capacity building to have the right people in the right places ; better governance and greater regulatory certainty ; more harmonised protocols and regulatory harmonisation across jurisdictions to reduce fragmentation and complexity ; and sustaining the multi-stakeholder model that the IAB had demonstrated .
Kim agreed that this is now implementation mode rather than just planning or documentation mode, and described the World Bank's commitment to investing more in resilient submarine cable approaches, including in Africa and West Africa through the West African Integration Programme, and to attracting more private sector participation . He emphasised the importance of clarifying roles and responsibilities among governments, development finance institutions, and private operators, with governments adopting clear national and regional strategies incorporating geographic diversity, multiple landing points, and open access policies .
Jun Xian argued that only through concrete implementation and deep pragmatic cooperation between government and industry can barriers such as lengthy approval timelines, insufficient geographic diversity, and imbalanced regional resources be resolved, and the resilience of the global submarine cable network be systematically strengthened .
---
#
Legal Frameworks and Unresolved Questions
An audience participant introduced a dimension that had not been raised by the panellists: whether the IAB report suggests an international constructive legal approach, and whether ITU might seek an advisory opinion from international legal bodies analogous to the role scientific bodies have played in prompting international legal opinions on climate change . Lamanauskas responded cautiously, noting that the current focus was on implementation of existing frameworks and sharing best practices, and that the IAB report's direct focus was on implementation and best practice rather than legal reform . He acknowledged that the UN Department of the Law of the Sea had been an observer to the advisory body, and that results had been presented to the International Seabed Authority, the IMO, and other bodies for their reflection . He also noted the existence of a 19th-century treaty on telegraph cable protection that some countries apply, though it is not universally accepted .
This exchange highlighted a potential gap in the IAB's work: while the report provides a comprehensive framework for best practice and implementation, the adequacy of existing international legal instruments for addressing modern submarine cable vulnerabilities remains an open question. The question of whether stronger binding international legal frameworks are ultimately needed - and whether ITU or other bodies should pursue such mechanisms - was left unresolved, representing an important thread for future deliberation.
---
#
Closing Remarks and Forward Outlook
In his closing remarks, Lamanauskas reflected on the physical reality of submarine cables - thin, long, and vulnerable despite the enormous dependence placed upon them by modern economies and societies - as a reminder of why protection matters . He noted the extraordinary collaborative achievement represented by the report, which had effectively been co-authored by more than 200 people who all had to agree on its contents, and called on all stakeholders to now implement the rich expertise it contains .
He observed that the session had come full circle: the initiative had begun at the WSIS Forum two years earlier with Minister Tijani, Professor Maximiano, John Wrottesley, and himself on a panel, and it was fitting to close that chapter with a concrete deliverable while setting the stage for the critically important implementation phase . The overall tone of the closing was firmly action-oriented, with the consensus of the room captured in the phrase that had recurred throughout the day: the time for documentation has passed, and the work of moving from paper to practice must now begin in earnest.
Submarine cables carry 99% of international internet traffic and are fundamental to economies, societies, and financial systems - critical infrastructure reminder
Arg. 1Mr. Lamanauskas emphasised that submarine cables are a critical infrastructure underpinning modern life, carrying the vast majority of international internet traffic. He stressed that economies, societies, and financial systems are deeply dependent on this infrastructure, and that disruptions are felt acutely when cables break.
He noted that submarine cables carry around 99% of international internet traffic , that economies and financial infrastructure depend on them , and that in 2025 alone there were around 180 cable breaks, with simultaneous multiple breaks being particularly impactful .
on: Submarine cables are critical infrastructure fundamental to modern economies, societies, and security
The IAB successfully completed its work with 42 members, 175 working group experts, and produced a 200-page report expected to become a handbook for the field
Arg. 2Mr. Lamanauskas outlined the scale and ambition of the International Advisory Board on Submarine Cable Resilience, which brought together a large number of members and experts over two years. He described the resulting 200-page report as a rich resource that he expects will serve as a definitive handbook for the field.
He explained that the IAB had 42 members (40 plus two co-chairs) and that working groups involved 175 experts from around the world . The working groups examined repair and deployment practices, risk monitoring and identification, and connecting the unconnected . He described the final output as a 200-page report that he believes will become a handbook for the area .
on: The most urgent priority now is moving from paper to practice — translating IAB recommendations into concrete implementation
Cables are physically thin and vulnerable despite the enormous dependence placed upon them by modern economies and societies
Arg. 3Mr. Lamanauskas used a physical prop — a piece of submarine cable — to illustrate the contrast between the enormous reliance placed on submarine cables and their physical fragility. He argued that this vulnerability makes their protection all the more urgent.
He referenced the physical piece of CWI-3 lightweight cable brought by Mr. Wrottesley, noting that despite the enormous dependence of economies and societies on submarine cables, they are physically quite thin and therefore do not take much to break .
The existing legal framework, including the UN Department of the Law of the Sea and historical treaties, should be considered by member states when evaluating whether legal frameworks need strengthening
Arg. 4In response to an audience question about whether an international legal approach should be pursued, Mr. Lamanauskas noted that the current focus has been on implementing existing frameworks and sharing best practices. He acknowledged that the question of whether legal frameworks need strengthening is ultimately one for member states and legal professionals to consider.
He noted that the UN Department of the Law of the Sea is an observer to the IAB , and that results have been presented to bodies such as the International Seabed Authority and the IMO . He also referenced a 19th-century treaty on telegraph cable protection that some countries still apply , while clarifying that the IAB report's direct focus was on implementation and best practice rather than legal reform .
on: Whether the primary focus should be on strengthening international legal frameworks or implementing existing ones
The world must become anti-fragile; as connectivity and dependence on intelligent systems grow, ensuring cable resilience becomes an existential responsibility
Arg. 1Dr. Tijani argued that in an increasingly networked world, systems must not merely withstand stress but learn from it — a concept he described as anti-fragility. He contended that as reliance on connectivity and intelligent systems deepens, the responsibility to ensure cable resilience becomes ever more critical.
He invoked the concept of anti-fragility, arguing that fragile systems give way under stress and that the world must instead learn from disruptions . He warned that the more the world becomes connected and dependent on intelligent systems, the greater the consequences of a major cable cut .
on: Resilience cannot be achieved by any single stakeholder acting alone; multi-stakeholder cooperation involving governments, industry, and international organisations is essential
The IAB report is a landmark document that will guide thinking about connectivity and serves as a model for resilience generally, including beyond submarine cables
Arg. 2Dr. Tijani expressed strong personal enthusiasm for the IAB report, describing it as a stellar piece of work that will shape how countries think about connectivity. He also noted that the advisory body's approach could serve as a broader model for resilience thinking beyond submarine cables.
He stated that he personally believes the IAB will become a model for resilience generally , and referenced ITU's related report with Science Pool on 'when digital fails', noting that many countries are not ready for digital system failures . He described the report as a masterpiece that every country should use to create action .
on: The most urgent priority now is moving from paper to practice — translating IAB recommendations into concrete implementation
When cables broke off West Africa in March 2024, government ministers were largely unprepared and lacked clear protocols for coordination and response
Arg. 3Dr. Tijani drew on his personal experience during the West Africa cable cuts of March 2024 to illustrate the lack of governmental preparedness. He admitted that as a minister he was largely clueless about what to do and that existing frameworks left the response largely to cable owners, without adequate government coordination.
He described the cable cut on 14 March 2024 affecting several cables including the Main One cable , and admitted that as a minister he was 'totally clueless' on what to do to support the response . He noted that cables were often treated as private property, leaving government without a clear role, even though the economic impact extended far beyond cable owners .
on: Whether submarine cables are primarily private property and responsibility or a public good requiring collective government action
Lengthy and fragmented approval and permitting processes across multiple agencies create significant delays and costs for cable deployment and repair
Arg. 4Dr. Tijani highlighted that in Nigeria, cable landing previously required clearance from multiple agencies, creating significant delays and costs. He argued that streamlined, government-coordinated processes are essential to reducing these barriers.
He recounted that for a recent cable landing in Nigeria, companies had to approach multiple agencies for different clearances, but because they came to his ministry first, a presidential directive was obtained that aligned all agencies, enabling the fastest cable landing in the country's history . He noted that every additional day spent in the process represents a cost to the companies .
on: Streamlined, coordinated government permitting and regulatory processes are essential for efficient cable deployment and repair
Nigeria's experience demonstrates that government coordination across agencies is essential; a presidential directive enabled faster cable landing than ever before in the country's history
Arg. 5Dr. Tijani used Nigeria's experience with a recent cable landing as a concrete example of how effective government coordination can dramatically accelerate processes. He argued that this demonstrates the critical enabling role that government can play when it acts proactively.
He described how, when a cable company came to his ministry first, he was able to secure a presidential directive that aligned all relevant agencies, resulting in the fastest cable landing in Nigeria's history . He contrasted this with the previous situation where companies had to navigate multiple agencies independently .
ITU should support governments in taking the right actions and putting the right protocols in place, as governments need that support to position their nations for greater investment
Arg. 6Dr. Tijani argued that ITU has a vital role in supporting governments to develop the right enabling environment and protocols for submarine cable resilience. He contended that when governments act clearly and decisively, it attracts private investment and benefits both businesses and society.
He cited Nigeria's declaration of telecommunications infrastructure as critical national infrastructure, which he said led to over one billion dollars of private investment within six months . He argued that ITU should support governments to take the right action and put the right protocols in place, enabling nations to attract investment .
Every nation should have a clear plan defining the role of government in submarine cable resilience; government must create the enabling environment and provide clarity on its role to attract investment and protect society
Arg. 7Dr. Tijani argued that governments must move beyond passive observation and take an active, clearly defined role in submarine cable resilience. He stressed that this is not about controlling business but about creating the enabling environment that allows businesses and society to thrive.
He argued that government's role is to put the right enabling environment in place, not to control businesses , and that every nation should have a clear plan on the role of government . He warned that if government is soft about its role, it is businesses and society that will suffer .
on: The degree to which government should actively coordinate and direct cable resilience versus creating a passive enabling environment
Submarine cables are not only a telecommunication issue but an economic, security, and development priority, carrying over 99% of international data traffic
Arg. 1Prof. Maximiano emphasised that submarine cables must be understood as infrastructure with implications far beyond telecommunications, encompassing economic, security, and development dimensions. She argued that protecting them requires action across multiple fronts.
She stated that as infrastructure carrying more than 99% of international data traffic, submarine cables are fundamental to digital economies and societies , and that protecting them is an economic, security, and development priority . She outlined the need for greater diversity and redundancy, sustained investment, streamlined regulatory procedures, and best practices for risk prevention .
on: Submarine cables are critical infrastructure fundamental to modern economies, societies, and security
The IAB represents a transition from awareness to action, identifying challenges, exchanging global experience, and developing practical recommendations for operational preparedness
Arg. 2Prof. Maximiano described the IAB's work as a journey from awareness to action, emphasising that the focus must now shift to transforming recommendations into operational preparedness. She stressed that this means establishing clear responsibilities, improving coordination, and ensuring countries can respond, repair, and recover quickly.
She described the IAB's work as a transition 'from awareness to action' and 'from paper to practice' , noting that the board identified challenges, exchanged global experience, and developed practical recommendations . She emphasised that shared responsibility now lies in transforming those recommendations into operational preparedness, including clear responsibilities and improved coordination .
on: The IAB report is a landmark achievement that will serve as a valuable handbook and model for submarine cable resilience
Many countries are not ready for digital system failures, and without clear governance frameworks, resilience cannot be achieved by any single stakeholder acting alone
Arg. 3Prof. Maximiano argued that resilience is inherently a multi-stakeholder challenge and that no single actor can achieve it alone. She stressed that governments, regulators, industry, international organisations, the technical community, and academia all have essential roles to play.
She stated that perhaps the most important lesson from the advisory body is that resilience cannot be achieved by a single stakeholder acting alone , and that governments, regulators, industry, international organisations, the technical community, and academia all have a role to play .
on: Resilience cannot be achieved by any single stakeholder acting alone; multi-stakeholder cooperation involving governments, industry, and international organisations is essential
Portugal's experience shows that geography creates both opportunity and responsibility; resilience must be built by design and depends on cooperation before incidents occur
Arg. 4Prof. Maximiano drew on Portugal's experience as an Atlantic gateway to illustrate that geographic advantage comes with significant responsibility. She argued that resilience must be designed into infrastructure from the outset and that cooperation among stakeholders must be established before incidents occur.
She noted that around 25% of submarine cables pass through Portugal's exclusive economic zone, positioning the country as a technological hub but also giving it greater responsibility . She cited the Atlantic Cam cable connecting Portugal with Madeira and Azores as an example of resilience built by design through a ring topology . She also highlighted national exercises involving regulators, operators, the Navy, and other public authorities as an example of cooperation before incidents occur .
The most urgent priority is moving from paper to practice: translating IAB recommendations into operational preparedness through investment, capacity building, better governance, and regulatory certainty
Arg. 5Prof. Maximiano argued that the most critical next step is implementation — moving beyond documentation to concrete action. She identified investment, capacity building, better governance, and regulatory certainty as the key pillars of this transition.
She called for investment not only in deploying more cables and repair capacity, but also in capacity building to have the right people in the right places . She stressed the need for better governance and greater regulatory certainty, explaining that effective regulation provides clarity, predictability, and cooperation throughout the lifecycle of submarine cable systems . She also called for more harmonised protocols and regulatory harmonisation across jurisdictions .
on: Investment in repair capacity, cable deployment, and capacity building is urgently needed to address the deteriorating state of the global repair fleet and growing demand
on: The relative importance of regulatory certainty and harmonisation versus industry-led innovation as the primary driver of resilience
The ICPC found the IAB collaboration to be a fantastic multi-stakeholder effort, and the resulting report deserves careful attention and action towards implementation
Arg. 1Mr. Wrottesley, representing the ICPC as ITU's partner in the IAB work, expressed strong endorsement of the collaborative process and the resulting report. He emphasised the importance of moving towards implementation and recommended that all stakeholders engage carefully with the report.
He stated that from the ICPC's perspective, the collaboration to produce the report and work with all stakeholders involved was fantastic . Unlike Mr. Lamanauskas, he noted that he had read every word of the report several times , and strongly recommended that everybody take note of it and look towards implementation .
on: The IAB report is a landmark achievement that will serve as a valuable handbook and model for submarine cable resilience
For Singapore, a sea-locked island nation, submarine cable connectivity is critical not just for prosperity but for survival
Arg. 1Mr. Chin explained that Singapore's unique geographic situation as a small island nation in a region of 700 million people makes submarine cable connectivity existentially important. He argued that this context drives Singapore's proactive and comprehensive approach to cable resilience.
He described Singapore as a small island in Southeast Asia, fundamentally sea-locked, where the surrounding waters are largely part of neighbouring countries' waters . He noted that Singapore put out a digital connectivity blueprint in 2023 with an ambition to double the number of cables from 26 within 10 years, and that they are currently just over 30 cables .
on: Submarine cables are critical infrastructure fundamental to modern economies, societies, and security
Singapore has enacted fit-for-purpose laws, maritime spatial planning, protected cable zones, cable burial requirements, and a streamlined single-point-of-contact permitting system with repair approvals within three to five working days
Arg. 2Mr. Chin outlined Singapore's comprehensive policy and regulatory approach to submarine cable resilience, which combines fit-for-purpose legislation, spatial planning, and streamlined administrative processes. He highlighted the importance of a whole-of-government approach with a single coordinating body.
He described how Singapore ensures individual laws such as the Telecommunications Act, Maritime and Port Authority Act, and Merchant Shipping Act contain sufficient provisions for subsea cables, including requirements for cables to be buried to 4 to 12 metres depth . He noted that IMDA acts as a single point of contact for cable deployment applications , and that the Maritime Port Authority commits to responding to cable repair applications within three to five working days, reduced from one week .
on: Streamlined, coordinated government permitting and regulatory processes are essential for efficient cable deployment and repair
A whole-of-government approach, with a single coordinating body for cable-related applications, is essential for effective and efficient cable resilience management
Arg. 3Mr. Chin argued that effective cable resilience management requires governments to coordinate internally and present a unified interface to industry. He emphasised that applicants should not have to navigate multiple agencies and that back-end coordination is the government's responsibility.
He explained that IMDA acts as the single point of contact in the Singapore government for cable deployment applications, coordinating with all other relevant agencies at the back end , so that cable owners and operators only need to reach out to one body . He also noted that the Maritime Port Authority serves as the single point of contact for cable repair applications .
on: The degree to which government should actively coordinate and direct cable resilience versus creating a passive enabling environment
International organisations such as ITU play a key role in awareness building, advocacy, and convening the right stakeholders to address submarine cable resilience collectively
Arg. 4Mr. Chin identified three distinct but equally important roles for international organisations in advancing submarine cable resilience: building awareness, advocating for the issues, and convening the right people for productive dialogue. He argued that the IAB report itself demonstrates these roles in action.
He stated that international organisations can play key roles in awareness building, advocacy, and bringing their convening power to bear - getting the right people into the right room to have the right conversations . He cited the International Advisory Board and its report as a demonstration of these roles .
on: Resilience cannot be achieved by any single stakeholder acting alone; multi-stakeholder cooperation involving governments, industry, and international organisations is essential
Governments must first coordinate internally before engaging with the private sector, integrating both regulatory and economic needs into coherent policies and frameworks
Arg. 5Mr. Chin argued that the most important immediate step for governments is to achieve internal coordination before engaging with external partners. He stressed that from the perspective of citizens and businesses, government must appear and act as a unified entity.
He argued that when working with partners outside government - whether citizens or businesses - they do not see individual regulators or ministries but the government as a whole . He therefore argued it is incumbent on governments to be as coordinated as possible internally and to bring that coordination to their interactions with the private sector .
on: The most urgent priority now is moving from paper to practice — translating IAB recommendations into concrete implementation
Industry should continue to innovate, develop repair capabilities and technologies, and build capacity in partner organisations to enhance submarine cable resilience
Arg. 6Mr. Chin argued that industry's most important contribution is to do what it does best — innovate and bring new solutions — while also developing capability in partner organisations. He highlighted repair capacity and technology as particularly important areas for industry focus.
He stated that the most important thing for industry is to continue to innovate, bring new solutions and technologies to bear that can enhance submarine cable resilience , and to develop capability in partners, for example in terms of repair capacity, repair capability, and technology in repair vessels .
on: Investment in repair capacity, cable deployment, and capacity building is urgently needed to address the deteriorating state of the global repair fleet and growing demand
A single cable incident in Tonga caused 61 days of near-total digital isolation, affecting 39% of the country's GDP, illustrating the catastrophic impact of cable failures on small economies
Arg. 1Mr. Kim used the example of Tonga's 2022 volcanic eruption and subsequent cable damage to illustrate the disproportionate impact that cable failures can have on small island economies. He argued that advancing resilience and inclusion in submarine cable infrastructure is crucial for all, but especially for small economies.
He cited the 2022 volcanic eruption in Tonga, where damage to a single cable resulted in near-total digital isolation for 61 days and affected $182 million in GDP, representing 39% of Tonga's total GDP .
on: Submarine cables are critical infrastructure fundamental to modern economies, societies, and security
The IAB's work, including Working Group 3 on fostering connectivity and geographic diversity, identified critical gaps and market failures in submarine cable resilience
Arg. 2Mr. Kim described the World Bank's participation in the IAB, particularly in leading Working Group 3 on fostering connectivity and geographic diversity. He argued that this work identified critical gaps and market failures that need to be addressed through concrete measures.
He noted that the World Bank led Working Group 3 on fostering connectivity and geographic diversity , and that the group found advancing resilience and inclusion in submarine cable infrastructure for small economies to be crucial . He identified market failure and gaps as a starting point for concrete measures .
There are approximately 150–200 cable outages per year globally, 80% caused by human maritime activities, yet only around 70 repair vessels exist, with many over 30 years old, causing average repair times to increase from 20 to over 50 days
Arg. 3Mr. Kim presented stark statistics on the scale of the cable outage problem and the inadequacy of the current repair fleet. He argued that the situation is deteriorating, with repair times more than doubling as the fleet ages and demand increases.
He stated that between 150 to 200 outages occur every year globally, with 80% caused by human maritime activities . He noted that there are only roughly 70 repair vessels, of which only 20 to 25 are dedicated long-term repair vessels, and a significant share of the fleet is over 30 years old . As a result, average repair time has increased from around 20 days to more than 50 days .
on: Investment in repair capacity, cable deployment, and capacity building is urgently needed to address the deteriorating state of the global repair fleet and growing demand
Governments should establish clear national and regional strategies incorporating geographic diversity, multiple landing points, open access policies, and pro-competition regimes
Arg. 4Mr. Kim argued that governments have a specific and important role in establishing the strategic and regulatory frameworks that enable resilient submarine cable infrastructure. He emphasised the importance of geographic diversity, multiple landing points, and pro-competition policies.
He stated that from the government perspective, adopting clear national and regional strategies and implementation plans is really important, which requires geographic diversity consideration, multiple landing points, open access policy, and pro-competition regimes .
The World Bank views submarine cable infrastructure as a public good that no single country, individual, or private sector actor can fix alone, requiring collective international investment and action
Arg. 5Mr. Kim argued that submarine cable infrastructure must be understood as a public good, with the implication that its resilience cannot be left to any single actor. He called for greater public investment and collective international action to address the challenges.
He stated that submarine cable infrastructure must be seen as a public good and public infrastructure, and that no single country, individual, or private sector actor can fix it alone . He called for more attention and public investment for resilience and measures to quickly fix affected facilities and cables .
on: Resilience cannot be achieved by any single stakeholder acting alone; multi-stakeholder cooperation involving governments, industry, and international organisations is essential
on: Whether submarine cables are primarily private property and responsibility or a public good requiring collective government action
Industry must integrate resilience into commercial models from the outset; private operators should not be allowed to proceed with models that do not adequately account for resilience
Arg. 6Mr. Kim argued that resilience must be embedded in the commercial models of private operators from the very beginning of project design. He stressed that development finance institutions and other stakeholders must push back on models that do not adequately account for resilience.
He stated that integrating resilience into commercial models is really important for private operators, and that if they cannot fully embrace safe and resilient measures from the beginning, stakeholders must keep pushing back and telling the private sector that it is not the right model . He also noted the importance of bringing stakeholders to the table early at the design stage to unlock resilient and inclusive project scope .
Development finance institutions like the World Bank will invest more in resilient submarine cable approaches, attract private sector participation, and support country-level vulnerability diagnosis and bankable project design
Arg. 7Mr. Kim outlined the World Bank's concrete commitments to advancing submarine cable resilience, including increased investment, de-risking mechanisms, and support for country-level vulnerability assessments. He emphasised the importance of designing resilience into projects from the outset.
He stated that the World Bank will invest more and consider more resilient approaches for submarine cables, including in Africa and West Africa through the West African integration programme . He described plans to bring de-risking mechanisms such as guarantee platforms or public grants to enable private sector investment , and to support country-level vulnerability diagnosis and bankable, resilient project design from the beginning .
on: The most urgent priority now is moving from paper to practice — translating IAB recommendations into concrete implementation
Cable route planning now proactively avoids high-risk zones such as fishing grounds, shipping lanes, seismic belts, and geopolitically sensitive choke points, with alternative terrestrial routes being developed
Arg. 1Ms. Jun Xian explained that the industry has developed targeted risk mitigation strategies in route planning, proactively steering clear of high-risk areas. She highlighted the development of alternative routes, particularly to bypass the geopolitically sensitive Red Sea.
She noted that in route planning, developers proactively avoid high-risk zones including fishing grounds, anchorage areas, shipping lanes, seismic belts, and congested choke points such as the Strait of Malacca and the Red Sea . She cited new Eurasia cable systems that have adopted alternative Middle Eastern routes passing through Saudi Arabia or Oman via terrestrial routes to bypass the Red Sea .
Geopolitical risks, such as those in the Red Sea, and congested choke points create significant vulnerabilities in existing cable routes
Arg. 2Ms. Jun Xian identified geopolitical risks and congested maritime choke points as significant sources of vulnerability for submarine cable routes. She argued that these risks are driving the development of alternative routing strategies.
She cited the Red Sea and the Strait of Malacca as examples of congested choke points with significant geopolitical risks , and noted that new Eurasia cable systems have been developed with alternative routes to bypass the Red Sea for geopolitical reasons .
New submarine cable systems are designed with multiple landing stations, diversified deployment, and network redundancy to mitigate single-point failures
Arg. 3Ms. Jun Xian described how the industry designs new submarine cable systems with built-in resilience through multiple landing stations, diversified deployment, and network redundancy. She argued that this approach effectively mitigates the risk of single-point failures disrupting international services.
She explained that each submarine cable system is designed with multiple landing stations, each interconnecting with various independent cable systems, and that cross-border circuits and customer services are evenly distributed across diverse cable systems . She also noted that landing stations have dedicated backup resources reserved for service restoration in the event of a cable outage , and that by embracing diversified deployment and network redundancy, operators can effectively mitigate disruptions caused by single-point failures .
The IAB has developed a full set of measures and policy guidelines reflecting the shared aspiration of all parties to build a safe, reliable, and inclusive global submarine cable network
Arg. 4Ms. Jun Xian commended the IAB's work in producing a comprehensive set of measures and policy guidelines that reflect the collective aspirations of governments, industry, and international organisations. She argued that these guidelines provide a strong foundation for building a safer and more inclusive global submarine cable network.
She stated that the IAB's hard work has brought together expertise from government, industrial stakeholders, and international organisations, and has developed a full set of measures and policy guidelines reflecting the shared aspiration of all parties to jointly build a safe, reliable, and inclusive global submarine cable network .
on: The IAB report is a landmark achievement that will serve as a valuable handbook and model for submarine cable resilience
All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
Arg. 5Ms. Jun Xian argued that the top priority for the next five years must be the adoption and full implementation of the IAB's recommendations by all governments and industry enterprises. She contended that only through concrete implementation and deep cooperation can the key pain points in submarine cable resilience be resolved.
She stated that from the carrier and industry point of view, the top priority must be to encourage all governments and industrial enterprises worldwide to actively adopt and fully implement all the guiding recommendations put forward by the IAB . She argued that only through concrete implementation and deep pragmatic cooperation between government and industry can barriers such as lengthy approval timelines, insufficient geographic diversity, and imbalanced regional resources be resolved .
on: Investment in repair capacity, cable deployment, and capacity building is urgently needed to address the deteriorating state of the global repair fleet and growing demand
on: The relative importance of regulatory certainty and harmonisation versus industry-led innovation as the primary driver of resilience
The USA relies on undersea cables for economic growth, national security, and digital future; they are how trillions of dollars in transactions are performed daily
Arg. 1Mr. Mills emphasised the United States' deep reliance on undersea cables for economic, security, and digital purposes. He argued that cables are critical infrastructure that require the attention and care of both governments and industry.
He stated that the United States relies on undersea cables for economic growth, security, national security, and its digital future . He noted that the world is increasingly aware that undersea cables are how citizens connect, how trillions of dollars in transactions are performed daily, and how the internet empowers future innovators .
on: Submarine cables are critical infrastructure fundamental to modern economies, societies, and security
Governments must communicate their priorities clearly to industry, investigate cable breaks through transparent legal processes, and provide a secure and trusted environment for industry to operate
Arg. 2Mr. Mills argued that governments have a distinct and important role in communicating their priorities to industry, ensuring legal accountability for cable breaks, and creating a secure environment in which industry can operate and innovate. He stressed that industry and government have different but complementary priorities.
He argued that industry knows the operational details of cable maintenance better than government, but that government must communicate back what its priorities are, since industry may not fully understand them . He also noted that governments are more concerned about cause and legal accountability for cable breaks, and that these should be investigated through transparent processes with due process .
on: Resilience cannot be achieved by any single stakeholder acting alone; multi-stakeholder cooperation involving governments, industry, and international organisations is essential
on: The degree to which government should actively coordinate and direct cable resilience versus creating a passive enabling environment
Industry knows the operational details of cable maintenance and continuity better than governments and must be enabled and unleashed to innovate while cooperating with public authorities
Arg. 3Mr. Mills argued that industry possesses superior operational knowledge about cable maintenance and continuity, and that governments should focus on enabling industry to act rather than trying to replicate that knowledge. He stressed the importance of creating a trusted environment in which industry can innovate freely.
He stated that industry probably knows the details better than government because it is their job to maintain continuity of operations and to know when cables break and how to repair them as quickly as possible . He argued that industry must be unleashed to innovate and make money, while government creates the secure and trusted environment .
on: Whether submarine cables are primarily private property and responsibility or a public good requiring collective government action
Information sharing between government and industry is critical, as is legal accountability for cable breaks investigated through transparent due process
Arg. 4Mr. Mills identified information sharing and legal accountability as the two most important contributions governments can make to submarine cable resilience. He argued that these complement industry's operational expertise and create the conditions for a secure and trusted environment.
He stated that a lot of what government can do better involves information sharing and communication of priorities , and that governments are more concerned about cause and legal accountability for cable breaks, which should be investigated through transparent processes with due process .
The audience raised the question of whether an international constructive legal approach or advisory opinion, similar to the IPCC's role on climate change, should be pursued for submarine cable protection
Arg. 1An audience member raised the question of whether the IAB report and ITU's work should lead to a more formal international legal approach to submarine cable protection. Drawing an analogy with the IPCC's role in generating an advisory opinion on climate change, the speaker asked whether a similar mechanism could be pursued for submarine cables.
The audience member asked whether the report suggests an international constructive legal approach, referencing discussions in New York the previous month about hotspot areas . They drew an analogy with the IPCC, which gave a strong recommendation that resulted in an advisory opinion by the ICJ and ITLOS on climate change, and asked whether ITU is planning to seek a similar advisory opinion .
on: Whether the primary focus should be on strengthening international legal frameworks or implementing existing ones
Session Knowledge Graph
Speakers · Topics · Arguments · Relationships
All speakers agreed that submarine cables represent critical infrastructure underpinning modern life. Mr. Lamanauskas noted they carry around 99% of international internet traffic and that economies and financial infrastructure depend on them . Prof. Maximiano reinforced this, stating they are fundamental to digital economies and societies and that protecting them is an economic, security, and development priority . Mr. Chin described them as existentially important for Singapore as a sea-locked island nation . Mr. Kim illustrated the catastrophic impact with the Tonga example, where a single cable incident affected 39% of GDP . Mr. Mills emphasised that cables are how trillions of dollars in transactions are performed daily . Dr. Tijani warned that the more the world becomes connected and dependent on intelligent systems, the greater the consequences of a major cable cut .
Submarine cables carry 99% of international internet traffic and are fundamental to economies, societies, and financial systems - critical infrastructure reminder
The world must become anti-fragile; as connectivity and dependence on intelligent systems grow, ensuring cable resilience becomes an existential responsibility
Submarine cables are not only a telecommunication issue but an economic, security, and development priority, carrying over 99% of international data traffic
For Singapore, a sea-locked island nation, submarine cable connectivity is critical not just for prosperity but for survival
A single cable incident in Tonga caused 61 days of near-total digital isolation, affecting 39% of the country's GDP, illustrating the catastrophic impact of cable failures on small economies
The USA relies on undersea cables for economic growth, national security, and digital future; they are how trillions of dollars in transactions are performed daily
The IAB has developed a full set of measures and policy guidelines reflecting the shared aspiration of all parties to build a safe, reliable, and inclusive global submarine cable network
There was strong consensus that the IAB report represents a significant achievement. Mr. Lamanauskas described the 200-page report as rich information that he believes will become a handbook for the area , noting it was co-written by more than 200 people . Dr. Tijani called it a masterpiece and stated that every country should take it and create something out of it , and personally believes the IAB will become a model for resilience generally . Prof. Maximiano described the IAB's work as a transition from awareness to action and from paper to practice . Mr. Wrottesley stated from the ICPC's perspective that the collaboration was fantastic and that he had read every word and strongly recommended everyone engage with it . Ms. Jun Xian commended the IAB's hard work in bringing together expertise from government, industry, and international organisations .
The IAB successfully completed its work with 42 members, 175 working group experts, and produced a 200-page report expected to become a handbook for the field
The IAB report is a landmark document that will guide thinking about connectivity and serves as a model for resilience generally, including beyond submarine cables
The IAB represents a transition from awareness to action, identifying challenges, exchanging global experience, and developing practical recommendations for operational preparedness
The ICPC found the IAB collaboration to be a fantastic multi-stakeholder effort, and the resulting report deserves careful attention and action towards implementation
The IAB has developed a full set of measures and policy guidelines reflecting the shared aspiration of all parties to build a safe, reliable, and inclusive global submarine cable network
Multiple speakers converged on the theme of moving from documentation to action. Mr. Lamanauskas used the phrase 'from paper to practice' and noted that the stage to move to is implementation . Prof. Maximiano stated that the work of the IAB should be seen as a transition from awareness to action and that the shared responsibility now is to transform recommendations into operational preparedness . Mr. Chin noted that the real work starts after the report is finalised and that we really move into implementation . Mr. Kim agreed that this is now implementation mode rather than just planning or documentation mode . Ms. Jun Xian argued that the top priority must be to encourage all governments and industrial enterprises worldwide to actively adopt and fully implement all the guiding recommendations .
The IAB successfully completed its work with 42 members, 175 working group experts, and produced a 200-page report expected to become a handbook for the field
The IAB report is a landmark document that will guide thinking about connectivity and serves as a model for resilience generally, including beyond submarine cables
The most urgent priority is moving from paper to practice: translating IAB recommendations into operational preparedness through investment, capacity building, better governance, and regulatory certainty
Governments must first coordinate internally before engaging with the private sector, integrating both regulatory and economic needs into coherent policies and frameworks
Development finance institutions like the World Bank will invest more in resilient submarine cable approaches, attract private sector participation, and support country-level vulnerability diagnosis and bankable project design
All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
There was unanimous agreement that resilience requires collective action. Prof. Maximiano stated that perhaps the most important lesson from the advisory body is that resilience cannot be achieved by a single stakeholder acting alone, and that governments, regulators, industry, international organisations, the technical community, and academia all have a role to play . Mr. Kim stated that submarine cable infrastructure must be seen as a public good and public infrastructure, and that no single country, individual, or private sector actor can fix it alone . Dr. Tijani emphasised that the idea was how governments and the private sector can really come together . Mr. Mills noted that industry must be unleashed to innovate while government creates the secure and trusted environment . Ms. Jun Xian argued that only through concrete implementation and deep pragmatic cooperation between government and industry can barriers be resolved .
The world must become anti-fragile; as connectivity and dependence on intelligent systems grow, ensuring cable resilience becomes an existential responsibility
Many countries are not ready for digital system failures, and without clear governance frameworks, resilience cannot be achieved by any single stakeholder acting alone
International organisations such as ITU play a key role in awareness building, advocacy, and convening the right stakeholders to address submarine cable resilience collectively
The World Bank views submarine cable infrastructure as a public good that no single country, individual, or private sector actor can fix alone, requiring collective international investment and action
Governments must communicate their priorities clearly to industry, investigate cable breaks through transparent legal processes, and provide a secure and trusted environment for industry to operate
All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
Speakers agreed that fragmented and slow permitting processes are a major obstacle and that streamlined, coordinated approaches are needed. Mr. Chin described Singapore's single-point-of-contact system for cable deployment applications and its commitment to responding to repair applications within three to five working days . Dr. Tijani recounted how in Nigeria, companies previously had to go to multiple agencies for different clearances, creating significant delays and costs , and that a presidential directive enabling coordination resulted in the fastest cable landing in the country's history . Prof. Maximiano called for more harmonised protocols and regulatory harmonisation across jurisdictions to make processes simpler and less fragmented . Ms. Jun Xian argued that only through deep cooperation can barriers such as lengthy approval timelines be resolved .
Singapore has enacted fit-for-purpose laws, maritime spatial planning, protected cable zones, cable burial requirements, and a streamlined single-point-of-contact permitting system with repair approvals within three to five working days
Lengthy and fragmented approval and permitting processes across multiple agencies create significant delays and costs for cable deployment and repair
The most urgent priority is moving from paper to practice: translating IAB recommendations into operational preparedness through investment, capacity building, better governance, and regulatory certainty
All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
Speakers converged on the need for greater investment in repair capacity and capability. Mr. Kim presented stark statistics showing that between 150 to 200 outages occur every year globally, with only roughly 70 repair vessels, many over 30 years old, causing average repair times to increase from around 20 days to more than 50 days . Prof. Maximiano called for investment not only in deploying more cables and repair capacity, but also in capacity building to have the right people in the right places . Mr. Chin argued that industry should develop capability in partners, for example in terms of repair capacity, repair capability, and technology in repair vessels . Prof. Maximiano also stressed the need for sustained investment in cable deployment, maintenance, and repair capabilities .
There are approximately 150–200 cable outages per year globally, 80% caused by human maritime activities, yet only around 70 repair vessels exist, with many over 30 years old, causing average repair times to increase from 20 to over 50 days
The most urgent priority is moving from paper to practice: translating IAB recommendations into operational preparedness through investment, capacity building, better governance, and regulatory certainty
Industry should continue to innovate, develop repair capabilities and technologies, and build capacity in partner organisations to enhance submarine cable resilience
All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
Both Mr. Chin and Dr. Tijani strongly emphasised the importance of a whole-of-government approach with a single coordinating body. Mr. Chin described how IMDA acts as the single point of contact in the Singapore government for cable deployment applications, coordinating with all other relevant agencies at the back end . Dr. Tijani drew a direct parallel, noting that when a cable company came to his ministry first in Nigeria, he was able to secure a presidential directive that aligned all agencies, resulting in the fastest cable landing in Nigeria's history . Dr. Tijani explicitly praised Singapore's model, saying every country must have that kind of coordinating body , and that if it is going to be a regulator, it should have a set protocol where all agencies are aware they can be summoned . Prof. Maximiano, Mr. Chin, and Dr. Tijani all shared the view that national-level policy frameworks and proactive government action are essential prerequisites for cable resilience. Prof. Maximiano argued that resilience must be built by design and depends on cooperation before incidents occur , citing Portugal's national exercises involving regulators, operators, the Navy, and other public authorities . Mr. Chin described Singapore's comprehensive legislative and regulatory framework and its whole-of-government coordination approach . Dr. Tijani argued that every nation should have a clear plan on the role of government and that government must come to the table and be clear about its role . Mr. Mills, Mr. Chin, and Dr. Tijani all agreed that government's role is fundamentally about creating the enabling environment and communicating clearly with industry, rather than controlling it. Mr. Mills argued that government must communicate its priorities to industry since industry may not fully understand them , and that industry must be unleashed to innovate while government creates the secure and trusted environment . Mr. Chin argued that governments must integrate both regulatory and economic needs into coherent policies . Dr. Tijani stated that government's role is not to control what businesses do but to put the right enabling environment in place . Mr. Kim, Prof. Maximiano, and Dr. Tijani all emphasised the need for international organisations and development finance institutions to actively support governments in building resilience. Mr. Kim described the World Bank's plans to invest more and consider more resilient approaches for submarine cables, including in Africa and West Africa , and to support country-level vulnerability diagnosis and bankable project design . Prof. Maximiano called for investment in capacity building to have the right people in the right places and for better governance and greater regulatory certainty . Dr. Tijani argued that ITU should support governments to take the right action and put the right protocols in place . Ms. Jun Xian, Prof. Maximiano, and Mr. Chin all shared the view that resilience must be designed into infrastructure from the outset rather than added retrospectively. Ms. Jun Xian explained that each submarine cable system is designed with multiple landing stations, each interconnecting with various independent cable systems, and that cross-border circuits and customer services are evenly distributed across diverse cable systems . Prof. Maximiano cited the Atlantic Cam cable connecting Portugal with Madeira and Azores as an example of resilience built by design through a ring topology . Mr. Chin described Singapore's requirements for cables to be buried to sufficient depth and its maritime spatial planning with protected zones for cables . Mr. Kim, Ms. Jun Xian, and Prof. Maximiano all agreed that resilience must be embedded in commercial and project design models from the very beginning. Mr. Kim argued that integrating resilience into commercial models is really important for private operators, and that if they cannot fully embrace safe and resilient measures from the beginning, stakeholders must keep pushing back . Ms. Jun Xian described how operators embrace diversified deployment and network redundancy during the investment and construction phase to effectively mitigate disruptions . Prof. Maximiano called for sustained investment in cable deployment, maintenance, and repair capabilities and for resilience to be built by design .
It was somewhat unexpected that senior government officials and regulators from different countries openly admitted to significant gaps in their own preparedness and knowledge. Dr. Tijani candidly admitted that when the West Africa cable cuts occurred on 14 March 2024, he was 'totally clueless' on what to do to support the response , and that there were not many documents that could help at the time . This level of candour from a minister is unusual in formal international settings. Prof. Maximiano's emphasis on the need for national exercises to test preparedness implicitly acknowledged that many countries, including those with significant cable infrastructure, are not yet adequately prepared. Mr. Chin's detailed description of Singapore's streamlined processes was framed partly as a model for others precisely because such coordination is not yet common. This collective acknowledgement of vulnerability from officials across Africa, Europe, and Asia created an unexpected degree of consensus around the need for honest self-assessment as a precondition for improvement.
It was somewhat unexpected to see consensus between development finance institutions, government officials, and industry representatives that submarine cables must be treated as public goods rather than purely private assets. Mr. Kim explicitly stated that submarine cable infrastructure must be seen as a public good and public infrastructure, and that no single country, individual, or private sector actor can fix it alone . Dr. Tijani challenged the notion that cables are purely private property, arguing that cable owners do not own the banks, are not responsible for GDP or healthcare, and that insurance payments cannot cover the losses to critical services . Even Mr. Mills, representing the US government in what he described as an industry-led domain , acknowledged that governments have a responsibility to ensure citizens and businesses have the necessary global connectivity . Ms. Jun Xian, representing a major carrier, endorsed the IAB's collective approach . This convergence between a development bank, government ministers, and an industry representative on the public goods nature of cable infrastructure was notably strong.
Given the current geopolitical context, it was notable that representatives from the United States and China (via China Telecom Europe), alongside representatives from Nigeria, Portugal, and Singapore, all expressed strong support for the same international cooperative framework and its recommendations. Mr. Mills expressed hope that the outcomes of the advisory body would give confidence that all parties are standing together to support undersea cables and taking actions to build resilience . Ms. Jun Xian, representing China Telecom, fully endorsed the IAB's work and called for all governments and industrial enterprises worldwide to actively adopt and fully implement all the guiding recommendations . This degree of alignment across geopolitically diverse actors on a shared framework for critical digital infrastructure was unexpected and significant.
There was an unexpected degree of consensus, particularly from technical and industry-adjacent speakers, that resilience is as much about governance, coordination, and preparedness as it is about physical infrastructure. Prof. Maximiano explicitly stated that resilience is not only about infrastructure, it is a lot about governance and preparedness and trusted cooperation , and cited national exercises as a demonstration of this . Dr. Tijani argued that resilience is not about new laws or fines but about what can be done to help coordination to be faster and better . Mr. Chin argued that governments must integrate both regulatory and economic needs into coherent policies . Mr. Mills distinguished between government's role in legal accountability and communication of priorities versus industry's operational expertise . This convergence on the governance dimension of resilience, rather than purely the technical or infrastructural dimension, was a notable area of unexpected consensus.
The discussion demonstrated an exceptionally high level of consensus across all major themes. All speakers agreed on the critical importance of submarine cables as foundational infrastructure for modern economies and societies . There was unanimous agreement that the IAB report represents a landmark achievement and that the immediate priority is moving from documentation to implementation . All speakers endorsed a multi-stakeholder approach involving governments, industry, and international organisations . There was strong convergence on the need for streamlined government coordination and permitting processes , investment in repair capacity and capability , and the embedding of resilience into infrastructure design from the outset . Speakers from diverse geographic and institutional backgrounds - including the US, China, Nigeria, Portugal, Singapore, and the World Bank - all endorsed the same cooperative framework and its recommendations .
Dr. Tijani explicitly challenged the notion that cables are purely private property, arguing that when cables broke off West Africa, the economic impact extended far beyond cable owners to banks, healthcare, and GDP . He stated that cable owners 'don't own the banks, they're not responsible for GDP' . Mr. Kim reinforced this by arguing that submarine cable infrastructure must be seen as 'a public good and public infrastructure' that no single country or private sector actor can fix alone . By contrast, Mr. Mills, while acknowledging government's role, emphasised that 'in many ways an industry-led domain and activity' and that industry must be 'unleashed to innovate and make money' , suggesting a more market-oriented framing that places primary operational responsibility with the private sector.
When cables broke off West Africa in March 2024, government ministers were largely unprepared and lacked clear protocols for coordination and response
The World Bank views submarine cable infrastructure as a public good that no single country, individual, or private sector actor can fix alone, requiring collective international investment and action
Industry knows the operational details of cable maintenance and continuity better than governments and must be enabled and unleashed to innovate while cooperating with public authorities
An audience member asked whether the IAB report suggests an international constructive legal approach, drawing an analogy with the IPCC's role in generating an advisory opinion on climate change from the ICJ and ITLOS . Mr. Lamanauskas responded by emphasising that the current focus was on 'implementation of existing frameworks' and sharing best practices, noting that member states and legal professionals should consider whether legal frameworks need strengthening . He clarified that the IAB report's direct focus was on 'implementation and best practice' rather than legal reform , suggesting a more cautious, incremental approach compared to the audience member's call for a more ambitious international legal mechanism.
The existing legal framework, including the UN Department of the Law of the Sea and historical treaties, should be considered by member states when evaluating whether legal frameworks need strengthening
The audience raised the question of whether an international constructive legal approach or advisory opinion, similar to the IPCC's role on climate change, should be pursued for submarine cable protection
Prof. Maximiano placed strong emphasis on regulatory certainty and harmonisation, arguing that 'effective regulation' provides 'clarity, predictability, and cooperation through the entire lifecycle of submarine cable systems' and calling for 'more harmonised protocols, regulatory harmonisation across jurisdictions' . Mr. Mills, while acknowledging the importance of a secure environment, argued that 'industry has to be unleashed to innovate and make money' and that industry 'probably knows the details better than government' , suggesting a lighter regulatory touch. Ms. Jun Xian, from an industry carrier perspective, focused primarily on implementation of IAB recommendations and breaking down 'geographical, industrial and regulatory barriers' , implying that existing regulatory complexity is itself a problem rather than a solution.
The most urgent priority is moving from paper to practice: translating IAB recommendations into operational preparedness through investment, capacity building, better governance, and regulatory certainty
Governments must communicate their priorities clearly to industry, investigate cable breaks through transparent legal processes, and provide a secure and trusted environment for industry to operate
All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
Dr. Tijani argued forcefully that 'government must come to the table, government must be clear about its role, and governments must play their role' , and that 'if we're soft about it, it's the businesses and society that will suffer' , suggesting an active, interventionist government posture. Mr. Chin similarly advocated for a whole-of-government approach with a single coordinating body , reflecting Singapore's proactive regulatory model. Mr. Mills, however, framed government's role more narrowly around communicating priorities, ensuring legal accountability, and creating a 'secure environment, trusted environment' while industry is 'unleashed to innovate' , suggesting a more limited government role focused on oversight rather than coordination.
Every nation should have a clear plan defining the role of government in submarine cable resilience; government must create the enabling environment and provide clarity on its role to attract investment and protect society
A whole-of-government approach, with a single coordinating body for cable-related applications, is essential for effective and efficient cable resilience management
Governments must communicate their priorities clearly to industry, investigate cable breaks through transparent legal processes, and provide a secure and trusted environment for industry to operate
Given the collaborative spirit of the IAB process, it was somewhat unexpected that a tension emerged between Dr. Tijani's strong assertion that cable breaks are a societal crisis requiring government intervention and Mr. Mills' more industry-centric framing. Dr. Tijani explicitly challenged the view that cables are 'private property' and the responsibility of cable owners alone, arguing that 'the owners of the cable don't own the banks, they're not responsible for GDP, they're not responsible for healthcare' . He argued that 'government must come to the table' and 'if we're soft about it, it's the businesses and society that will suffer' . Mr. Mills, by contrast, described submarine cable management as 'in many ways an industry-led domain and activity' and argued that industry must be 'unleashed to innovate and make money' . This tension between a government-interventionist and an industry-led framing was unexpected in what was otherwise a highly consensual discussion.
The audience question about whether ITU should seek an international advisory opinion analogous to the IPCC's role on climate change introduced an unexpected dimension to the discussion. While the panel had focused almost entirely on implementation of existing recommendations, this question raised the possibility that the current legal framework may be fundamentally inadequate. Mr. Lamanauskas' response was notably cautious, emphasising that the IAB report's 'direct focus' was on 'implementation and best practice' rather than legal reform , and referencing a 19th-century telegraph cable protection treaty that is 'not such a universally accepted' instrument . This unexpected divergence between the panel's implementation focus and the audience's call for more ambitious legal reform highlighted a potential gap in the IAB's work that was not otherwise surfaced during the discussion.
Mr. Kim presented stark data showing that average repair times have more than doubled from around 20 days to over 50 days due to an ageing and inadequate repair fleet , framing this as a market failure requiring public intervention and investment . This was somewhat at odds with the more optimistic framing offered by Ms. Jun Xian, who focused on how industry is already building resilience through route planning and network redundancy , without addressing the repair fleet crisis. Mr. Chin similarly focused on innovation and capability development without directly engaging with the deteriorating repair capacity data. The unexpected divergence between Mr. Kim's alarming picture of a worsening repair situation and the industry speakers' focus on design-stage resilience suggested a gap in the discussion about whether existing industry practices are actually sufficient to address the scale of the problem.
The discussion was characterised by a high degree of surface-level consensus around the importance of submarine cable resilience and the need to move from the IAB report to implementation. All speakers agreed that cables are critical infrastructure , that the IAB report is a significant achievement , and that the next phase must focus on concrete action . However, beneath this consensus lay meaningful disagreements about the appropriate role of government versus industry , the relative priority of regulatory harmonisation versus industry-led innovation , whether existing legal frameworks are sufficient or new international legal mechanisms are needed , and whether the deteriorating repair fleet represents a market failure requiring public intervention or a challenge that industry can address through design-stage resilience . The most significant structural tension was between speakers from developing country governments (particularly Dr. Tijani) who emphasised the need for active, interventionist government coordination, and speakers from industry and developed country governments (particularly Mr. Mills) who favoured a more enabling, industry-led approach.
All speakers agreed that the immediate priority is moving from the IAB report's recommendations to concrete implementation . However, they differed significantly on what implementation should prioritise: Dr. Tijani emphasised government coordination and clear protocols ; Mr. Chin focused on whole-of-government coordination and streamlined permitting ; Prof. Maximiano stressed investment, capacity building, and regulatory certainty ; Mr. Mills prioritised information sharing and legal accountability ; Mr. Kim called for public investment and resilience embedded in commercial models from the outset ; and Ms. Jun Xian focused on adoption of IAB recommendations to break down regulatory barriers . The shared goal of implementation masked significant differences in emphasis and approach.
Every nation should have a clear plan defining the role of government in submarine cable resilience; government must create the enabling environment and provide clarity on its role to attract investment and protect society A whole-of-government approach, with a single coordinating body for cable-related applications, is essential for effective and efficient cable resilience management The most urgent priority is moving from paper to practice: translating IAB recommendations into operational preparedness through investment, capacity building, better governance, and regulatory certainty Governments must communicate their priorities clearly to industry, investigate cable breaks through transparent legal processes, and provide a secure and trusted environment for industry to operate The World Bank views submarine cable infrastructure as a public good that no single country, individual, or private sector actor can fix alone, requiring collective international investment and action All governments and industry enterprises worldwide must actively adopt and fully implement the IAB's guiding recommendations to break down geographical, industrial, and regulatory barriers
All three speakers agreed that streamlined, coordinated government processes are essential for cable resilience, but their national experiences led to different models. Dr. Tijani described how a presidential directive was needed to align multiple agencies in Nigeria , suggesting an ad hoc, top-down solution to a fragmented system. Mr. Chin described Singapore's institutionalised single-point-of-contact model with committed response times of three to five working days , representing a more systematic and pre-established approach. Prof. Maximiano highlighted Portugal's national exercises involving regulators, operators, the Navy, and other public authorities as a model of preparedness through practice. All agreed coordination is essential but differed on whether it should be institutionalised by design or achieved through political will and ad hoc mechanisms.
Nigeria's experience demonstrates that government coordination across agencies is essential; a presidential directive enabled faster cable landing than ever before in the country's history Singapore has enacted fit-for-purpose laws, maritime spatial planning, protected cable zones, cable burial requirements, and a streamlined single-point-of-contact permitting system with repair approvals within three to five working days Portugal's experience shows that geography creates both opportunity and responsibility; resilience must be built by design and depends on cooperation before incidents occur
All three speakers agreed that industry has a critical role to play in submarine cable resilience, but differed on how much pressure should be placed on industry. Mr. Mills argued that industry should be 'unleashed to innovate and make money' , suggesting a permissive approach. Mr. Chin similarly argued that industry should 'continue to innovate, bring new solutions' and develop capability in partners , reflecting a collaborative rather than prescriptive stance. Mr. Kim, however, took a more demanding position, arguing that if private operators 'cannot really fully embrace this safe and resilient measures from the beginning in their commercial model, we have to keep pushing back' , suggesting that development finance institutions should actively challenge inadequate commercial models rather than simply enabling industry.
Industry knows the operational details of cable maintenance and continuity better than governments and must be enabled and unleashed to innovate while cooperating with public authorities Industry should continue to innovate, develop repair capabilities and technologies, and build capacity in partner organisations to enhance submarine cable resilience Industry must integrate resilience into commercial models from the outset; private operators should not be allowed to proceed with models that do not adequately account for resilience
All three speakers celebrated the IAB report as a landmark achievement, but differed in their characterisation of its scope and significance. Mr. Lamanauskas described it as a 'handbook for this area' , framing it as a practical reference document. Prof. Maximiano described it as a 'transition from awareness to action' , emphasising its role as a bridge to implementation. Dr. Tijani went furthest, describing it as a 'masterpiece' and suggesting it could become 'a model for resilience generally' beyond submarine cables, and even referencing ITU's related report on 'when digital fails' as part of a broader resilience agenda. This suggests different views on whether the IAB's work is primarily a technical handbook, an implementation roadmap, or a broader model for systemic resilience thinking.
The IAB represents a transition from awareness to action, identifying challenges, exchanging global experience, and developing practical recommendations for operational preparedness The IAB successfully completed its work with 42 members, 175 working group experts, and produced a 200-page report expected to become a handbook for the field The IAB report is a landmark document that will guide thinking about connectivity and serves as a model for resilience generally, including beyond submarine cables
- Submarine cables carry approximately 99% of international internet traffic and are fundamental to global economies, national security, and digital societies, making their resilience an existential priority rather than merely a telecommunications concern.
- The International Advisory Board (IAB) on Submarine Cable Resilience successfully completed its two-year mandate, producing a 200-page report developed by 42 members and 175 working group experts, which is expected to serve as a definitive handbook for the field.
- The global cable repair ecosystem is critically under-resourced: approximately 150–200 outages occur annually, 80% caused by human maritime activities, yet only around 70 repair vessels exist globally, many over 30 years old, causing average repair times to increase from 20 to over 50 days.
- A single cable incident in Tonga in 2022 caused 61 days of near-total digital isolation and affected 39% of the country's GDP, illustrating the disproportionate impact of cable failures on small and developing economies.
- Resilience cannot be achieved by any single stakeholder acting alone; effective submarine cable resilience requires coordinated action from governments, regulators, industry, international organisations, the technical community, and academia.
- The most urgent priority identified by all panellists is moving from paper to practice — translating the IAB's recommendations into concrete operational preparedness, investment, capacity building, and regulatory frameworks.
- Governments must establish clear internal coordination mechanisms before engaging with the private sector, with a single point of contact for cable-related applications being identified as a best practice, as demonstrated by Singapore's model.
- Industry already incorporates resilience into cable design through route planning that avoids high-risk zones, multiple landing stations, and network redundancy, but must also integrate resilience into commercial models from the outset.
- Regulatory certainty and harmonisation across jurisdictions are essential to reduce fragmentation, streamline permitting, and provide predictability throughout the entire lifecycle of submarine cable systems.
- International organisations such as ITU play a critical role in awareness building, advocacy, and convening multi-stakeholder dialogue, and should continue to support governments in implementing the IAB's recommendations.
- Development finance institutions such as the World Bank view submarine cable infrastructure as a public good requiring collective international investment, and are committed to designing resilient and bankable projects that attract private sector participation.
- Every nation should develop a clear national plan defining the role of government in submarine cable resilience, as government's primary function is to create an enabling environment — not to control industry — thereby attracting investment and protecting society.
“It's not about whether the CEO of the cable that is not being cut is seeing this as an opportunity for supremacy, but knowing that they have the moral obligation and the demand from society to be able to allow capacity to be switched onto their cable.”
“In Tonga, there was a volcanic eruption in 2022. Damage to a single cable resulted in near total digital isolation for 61 days. That affected $182 million GDP, which was 39% of total GDP of Tonga.”
“We are seeing between 150 to 200 outages every year across the globe. Almost 200 accidents are happening in our countries. But among them, 80% are caused by human maritime activities. But our reality to tackle this issue and to fix this accident, we have only roughly 70 vessels. And only 20 or 25 are dedicated long-term repairing. And we see there's some significant share of that 70 fleets are very old, 30 years old, more than 30 years old. So as a result, average repair time has been increasing. We used to fix this around 20 days, but nowadays it takes more than 50 days.”
“Our fragile systems will typically give up to stress. We have to ensure that our world is anti-fragile. In fact, when stress comes, I think we have to now learn from it.”
“When I was a minister, I was totally clueless on what I needed to do to be able to support this... I can go back home working with our regulator, ensuring that we're strengthening the desk that is responsible for subsea cable... The recommendations in this report give a strong foundation for ministers to be able to prepare better.”
“Effective regulation doesn't mean that we are creating additional obligations. It means that we are providing clarity, predictability, and cooperation through the entire lifecycle of submarine cable systems.”
“There's no world where government will look away from this, whether it's in landing or in repair or in redundancy. In fact, it's going to cost the businesses more if government is totally not in the loop.”
“Does this report suggest some kind of international constructive legal approach? Is this something ITU is also planning to seek — some sort of advisory opinion, like the IPCC recommendation that resulted in an advisory opinion by the ICJ on climate change?”
Should there be an international legal framework or treaty specifically addressing submarine cable protection, and could ITU seek an advisory opinion (similar to the IPCC's approach with the ICJ/ITLOS on climate change)?
The existing international legal framework for submarine cable protection dates back to a 19th-century telegraph cable protection treaty, which is not universally accepted or applied. As geopolitical tensions and the frequency of cable breaks increase, there is a growing need to assess whether current legal instruments are sufficient or whether new binding international legal frameworks are required. An advisory opinion from an international court could provide legal clarity and strengthen accountability.
How can existing international legal frameworks for submarine cable protection be strengthened or revised to address modern challenges, particularly in hotspot areas?
The discussion highlighted that the current report focuses on implementation of existing frameworks rather than legal reform. However, the adequacy of existing legal instruments, including the 19th-century telegraph cable protection treaty, was raised as an open question requiring further examination by member states and legal professionals.
How can regional redundancy protocols be established in West Africa, and could a regional monitoring centre be set up to predict and manage cable disruptions across the region?
West Africa shares many submarine cables across countries, yet there is currently no coordinated regional protocol for managing redundancy or predicting cable failures. Establishing a regional monitoring centre could significantly reduce the economic impact of cable outages, as demonstrated by the March 2024 cable cuts that left Nigeria and other countries without clear governmental protocols for response.
What is the current state of human capacity and talent available to manage submarine cable incidents, and how can countries build sufficient expertise to respond effectively?
Both speakers highlighted that many countries, particularly in the developing world, lack sufficient trained personnel to manage submarine cable incidents. Without adequate human capacity, even the best policies and protocols cannot be effectively implemented. This represents a critical gap that requires targeted investment in education and training programmes.
How can the repair vessel fleet be modernised and expanded given that roughly 70 vessels exist globally, only 20–25 are dedicated long-term repair vessels, and a significant share are over 30 years old, resulting in average repair times increasing from 20 to over 50 days?
The ageing and insufficient repair fleet is a systemic vulnerability in global submarine cable resilience. As the number of cable outages remains between 150–200 per year, the growing repair backlog poses an increasing risk to global digital connectivity and economic stability, particularly for small island and developing states.
How can de-risking mechanisms, such as guarantees and public grants, be better designed to encourage private sector investment in submarine cable resilience, particularly in underserved regions?
Private sector investment in submarine cable infrastructure in vulnerable or less commercially attractive regions remains insufficient. Developing effective public-private partnership models and financial de-risking instruments is essential to ensuring geographic diversity and resilience, especially for small economies that cannot attract investment on purely commercial terms.
How can regulatory harmonisation across jurisdictions be achieved to reduce fragmentation and complexity in permitting and repair approval processes for submarine cables?
Lengthy and inconsistent approval timelines across different national jurisdictions represent a significant barrier to timely cable deployment and repair. Harmonised regulatory protocols would reduce delays, lower costs, and improve the overall resilience of the global submarine cable network.
How should roles and responsibilities be clearly delineated among governments, development finance institutions, and private operators to ensure effective implementation of submarine cable resilience recommendations?
A recurring theme in the discussion was the lack of clarity about who is responsible for what in submarine cable resilience. Without clear delineation of roles, coordination failures are likely, as demonstrated by Nigeria's experience during the 2024 cable cuts. Establishing clear frameworks for responsibility is a prerequisite for effective implementation.
How can satellites be integrated into the broader submarine cable resilience ecosystem as a complementary or backup connectivity solution?
The discussion briefly touched on the potential role of satellites as part of a broader resilience ecosystem. Given the growing capabilities of satellite connectivity, further research is needed to understand how satellites can complement submarine cables during outages and how they should be incorporated into national and international resilience planning.
How can smart cable technologies, such as those being trialled in the Atlantic CAM cable connecting Portugal to Madeira and the Azores, be scaled and integrated into broader submarine cable systems to enhance early warning and scientific cooperation capabilities?
Smart cable technologies that embed sensors into submarine cables offer the potential for early warning of natural disasters and improved monitoring of cable health. Further research is needed to understand the technical, financial, and governance requirements for scaling these technologies across the global cable network.
How can open access policies and pro-competition regulatory regimes be designed to encourage geographic diversity and multiple landing points in submarine cable deployment, particularly in developing regions?
The concentration of cable landing points and the lack of geographic diversity in cable routes remain significant vulnerabilities. Research into effective open access and pro-competition frameworks could help attract investment to underserved regions and reduce single points of failure in the global network.
What mechanisms can be established to ensure that cable owners and operators share capacity during outages, moving beyond commercial competition to fulfil a broader societal obligation?
During the 2024 West Africa cable cuts, there was no clear protocol for competing cable operators to share capacity to restore connectivity. Developing frameworks that establish the moral and legal obligations of cable owners to cooperate during emergencies is critical to minimising the economic and social impact of future outages.
How can national governments develop and test preparedness exercises involving regulators, operators, military, and other public authorities to move submarine cable resilience from policy to operational practice?
Portugal's experience with national exercises demonstrated that resilience is as much about governance and preparedness as it is about infrastructure. Further research and guidance are needed on how countries, particularly those with fewer resources, can design and conduct effective multi-stakeholder preparedness exercises.
How can the ITU and other international organisations best support governments, particularly in developing countries, to implement the IAB recommendations and establish clear national strategies for submarine cable resilience?
Many governments, especially in the developing world, lack the institutional capacity, expertise, and resources to independently implement the IAB's recommendations. Understanding how international organisations can provide targeted, effective support is essential to ensuring that the report's recommendations translate into real-world improvements in global cable resilience.